ACCA F5 - Performance Management · Section B

Budgeting and Control Practice Questions

Review 10 sample questions with their correct answers and explanations. Sign up free to continue with the full topic quiz.

Sign up free for the full quiz

Question 1

Midvale Regional Authority (MRA) is responsible for the provision of a wide range of services in the Lesting region, which is based in the south of the country 'Alaia'. These services include, amongst others, responsibility for residents' welfare, schools, housing, roads and waste management. Over recent months the Lesting region experienced the hottest temperatures on record, resulting in several forest fires, which caused damage to several schools and some local roads. Unfortunately, these hot temperatures were then followed by flooding, which left a number of residents without homes and saw higher than usual numbers of admissions to hospitals due to the outbreak of disease. These hospitals were full and some patients were treated in tents. Residents have been complaining for some years that a new hospital is needed in the area. Prior to these events, the MRA was proudly leading the way in a new approach to waste management, with the introduction of its 'Waste Recycling Scheme'. Two years ago, it began phase 1 of the scheme and half of its residents were issued with different coloured waste bins for different types of waste. The final phase was due to begin in one month's time. The cost of providing the new waste bins is significant but LRA's focus has always been on the long-term savings both to the environment and in terms of reduced waste disposal costs. The MRA is about to begin preparing its budget for the coming financial year, which starts in one month's time. Over recent years, zero-based budgeting (ZBB) has been introduced at a number of regional authorities in Alaia and, given the demand on resources which LRA faces this year, it is considering whether now would be a good time to introduce it.

What are the main steps involved in preparing a zero-based budget?

  1. Identifying previous inefficiencies, using adaptive management processes and avoiding wasteful expenditure in planning
  2. Recognising different cost behaviour patterns, planning on a rolling basis and ignoring wasteful expenditure
  3. Analysing the cost of each activity, identifying alternative methods and assessing the consequences of performing the activity at different levels — Correct
  4. Updating the budget continually, setting performance standards and controlling performance monthly with the use of variance analysis

Correct answer

Analysing the cost of each activity, identifying alternative methods and assessing the consequences of performing the activity at different levels

Explanation

Zero-based budgeting requires managers to justify all costs from a zero base by analysing activities, considering alternatives and evaluating different levels of provision – essentially building the budget from scratch rather than rolling forward last year's figures.

Question 2

Midvale Regional Authority (MRA) is responsible for the provision of a wide range of services in the Lesting region, which is based in the south of the country 'Alaia'. These services include, amongst others, responsibility for residents' welfare, schools, housing, roads and waste management. Over recent months the Lesting region experienced the hottest temperatures on record, resulting in several forest fires, which caused damage to several schools and some local roads. Unfortunately, these hot temperatures were then followed by flooding, which left a number of residents without homes and saw higher than usual numbers of admissions to hospitals due to the outbreak of disease. These hospitals were full and some patients were treated in tents. Residents have been complaining for some years that a new hospital is needed in the area. Prior to these events, the MRA was proudly leading the way in a new approach to waste management, with the introduction of its 'Waste Recycling Scheme'. Two years ago, it began phase 1 of the scheme and half of its residents were issued with different coloured waste bins for different types of waste. The final phase was due to begin in one month's time. The cost of providing the new waste bins is significant but LRA's focus has always been on the long-term savings both to the environment and in terms of reduced waste disposal costs. The MRA is about to begin preparing its budget for the coming financial year, which starts in one month's time. Over recent years, zero-based budgeting (ZBB) has been introduced at a number of regional authorities in Alaia and, given the demand on resources which LRA faces this year, it is considering whether now would be a good time to introduce it.

Which TWO of the following statements are true? (1) Now is a good time to introduce ZBB in MRA. (2) The introduction of ZBB in any organisation is relatively straightforward. (3) The introduction of ZBB in MRA would be lengthy and costly. (4) A conflict situation may arise if ZBB is introduced in MRA.

  1. (1) and (2)
  2. (1) and (3)
  3. (3) and (4) — Correct
  4. (2) and (4)

Correct answer

(3) and (4)

Explanation

(3) is true – ZBB is time-consuming and resource-intensive, especially in a large public sector organisation with many activities. (4) is true – ZBB can create conflict as departments compete for limited resources and justify their existence. (1) is false due to current crises demanding urgent spending. (2) is false – implementation is complex and requires training.

Question 3

Midvale Regional Authority (MRA) is responsible for the provision of a wide range of services in the Lesting region, which is based in the south of the country 'Alaia'. These services include, amongst others, responsibility for residents' welfare, schools, housing, roads and waste management. Over recent months the Lesting region experienced the hottest temperatures on record, resulting in several forest fires, which caused damage to several schools and some local roads. Unfortunately, these hot temperatures were then followed by flooding, which left a number of residents without homes and saw higher than usual numbers of admissions to hospitals due to the outbreak of disease. These hospitals were full and some patients were treated in tents. Residents have been complaining for some years that a new hospital is needed in the area. Prior to these events, the MRA was proudly leading the way in a new approach to waste management, with the introduction of its 'Waste Recycling Scheme'. Two years ago, it began phase 1 of the scheme and half of its residents were issued with different coloured waste bins for different types of waste. The final phase was due to begin in one month's time. The cost of providing the new waste bins is significant but LRA's focus has always been on the long-term savings both to the environment and in terms of reduced waste disposal costs. The MRA is about to begin preparing its budget for the coming financial year, which starts in one month's time. Over recent years, zero-based budgeting (ZBB) has been introduced at a number of regional authorities in Alaia and, given the demand on resources which LRA faces this year, it is considering whether now would be a good time to introduce it.

Which of the following correctly describes a 'decision package' within the context of zero-based budgeting?

  1. A method of budgeting that requires each cost element to be specifically justified, as though the activities to which the budget relates were being undertaken for the first time — Correct
  2. The decision or choice between making a product in-house or outsourcing and buying in
  3. A method of budgeting based on an activity framework and utilising cost driver data in the budget-setting and variance feedback processes
  4. A list of costs that will not result in an outflow of cash either now or in the future or result in a 'real' cash expenditure

Correct answer

A method of budgeting that requires each cost element to be specifically justified, as though the activities to which the budget relates were being undertaken for the first time

Explanation

A decision package in ZBB is a document that identifies and describes a specific activity, including different levels of service/effort, associated costs and benefits, allowing management to rank and select packages.

Question 4

Midvale Regional Authority (MRA) is responsible for the provision of a wide range of services in the Lesting region, which is based in the south of the country 'Alaia'. These services include, amongst others, responsibility for residents' welfare, schools, housing, roads and waste management. Over recent months the Lesting region experienced the hottest temperatures on record, resulting in several forest fires, which caused damage to several schools and some local roads. Unfortunately, these hot temperatures were then followed by flooding, which left a number of residents without homes and saw higher than usual numbers of admissions to hospitals due to the outbreak of disease. These hospitals were full and some patients were treated in tents. Residents have been complaining for some years that a new hospital is needed in the area. Prior to these events, the MRA was proudly leading the way in a new approach to waste management, with the introduction of its 'Waste Recycling Scheme'. Two years ago, it began phase 1 of the scheme and half of its residents were issued with different coloured waste bins for different types of waste. The final phase was due to begin in one month's time. The cost of providing the new waste bins is significant but LRA's focus has always been on the long-term savings both to the environment and in terms of reduced waste disposal costs. The MRA is about to begin preparing its budget for the coming financial year, which starts in one month's time. Over recent years, zero-based budgeting (ZBB) has been introduced at a number of regional authorities in Alaia and, given the demand on resources which LRA faces this year, it is considering whether now would be a good time to introduce it.

Which ONE of the following statements is true?

  1. If any of the activities or operations at MRA are wasteful, ZBB will not be able to identify these and remove them
  2. With the implementation of ZBB, managers may become less motivated as they have had a key role in putting the budget together
  3. ZBB would discourage a more questioning attitude and lead managers to just the status quo
  4. Overall, ZBB at MRA will lead to a more efficient allocation of resources — Correct

Correct answer

Overall, ZBB at MRA will lead to a more efficient allocation of resources

Explanation

ZBB forces a thorough review of all activities, eliminating wasteful ones and prioritising essential services, leading to more efficient resource allocation – particularly valuable in constrained public sector environments.

Question 5

Midvale Regional Authority (MRA) is responsible for the provision of a wide range of services in the Lesting region, which is based in the south of the country 'Alaia'. These services include, amongst others, responsibility for residents' welfare, schools, housing, roads and waste management. Over recent months the Lesting region experienced the hottest temperatures on record, resulting in several forest fires, which caused damage to several schools and some local roads. Unfortunately, these hot temperatures were then followed by flooding, which left a number of residents without homes and saw higher than usual numbers of admissions to hospitals due to the outbreak of disease. These hospitals were full and some patients were treated in tents. Residents have been complaining for some years that a new hospital is needed in the area. Prior to these events, the MRA was proudly leading the way in a new approach to waste management, with the introduction of its 'Waste Recycling Scheme'. Two years ago, it began phase 1 of the scheme and half of its residents were issued with different coloured waste bins for different types of waste. The final phase was due to begin in one month's time. The cost of providing the new waste bins is significant but LRA's focus has always been on the long-term savings both to the environment and in terms of reduced waste disposal costs. The MRA is about to begin preparing its budget for the coming financial year, which starts in one month's time. Over recent years, zero-based budgeting (ZBB) has been introduced at a number of regional authorities in Alaia and, given the demand on resources which LRA faces this year, it is considering whether now would be a good time to introduce it.

Which of the following describe difficulties in assessing performance in not-for-profit organisations? (i) Benefits and costs are not always easy to quantify. (ii) These organisations often have multiple stakeholders and therefore multiple objectives. (iii) These organisations often have unlimited funds and are therefore not motivated to measure performance.

  1. (i) only
  2. (i) and (ii) — Correct
  3. (ii) only
  4. (ii) and (iii)

Correct answer

(i) and (ii)

Explanation

(i) and (ii) are key difficulties – outputs are often qualitative (e.g. improved welfare) and multiple/conflicting objectives exist among stakeholders. (iii) is incorrect – not-for-profit entities typically face resource constraints and are motivated to demonstrate efficient use of funds.

Question 6

Apex Manufacturing Co is a production company with a modest permanent workforce, but it also relies heavily on temporary staff, whom it recruits on three-month contracts whenever production requirements rise. All buying of materials is the responsibility of the purchasing department, and the company's policy is to maintain low inventory levels of raw materials in order to minimise inventory holding costs. Budgeting is carried out on spreadsheets and detailed variance reports are generated each month for sales, material costs and labour costs. Departmental managers are then paid a monthly bonus depending on the performance of their department. Apex Manufacturing Co operates in a rapidly evolving environment and its finance manager believes the original standard costs are unrealistic. He is contemplating revising the budget by analysing existing variances into a planning and operational element to improve performance. One month ago, Apex Manufacturing Co started manufacturing a new product. The standard cost card for one unit was drawn up to include a cost of 84 USD for labour, based on seven hours of labour at 12 USD per hour. Actual output of the product during the first month of production was 460 units and the actual time taken to manufacture the product totalled 1,860 hours at a total cost of 26,040 USD. After being presented with some initial variance calculations, the production manager realised that the standard time per unit of seven hours was the time taken to produce the first unit and that a learning rate of 90% should have been anticipated for the first 1,000 units of production. The production manager has consequently been criticised by other departmental managers who have said, 'He has no idea of all the problems this (i.e. the failure to anticipate the learning effect) has caused.' Apex Manufacturing Co uses cost plus pricing to set the selling prices for its products once an initial cost card has been drawn up. Prices are then reviewed on a quarterly basis.

Which TWO of the following statements about using spreadsheets in budgeting are true? (1) Spreadsheets enable managers to consider many different budget options and also carry out sensitivity analysis on the budget figures. (2) Minor errors in the spreadsheet cannot affect the validity of the data. (3) Spreadsheets are able to take qualitative factors into account. (4) The possibility of experimentation with data is so great that it is possible to lose sight of the original intention of the spreadsheet.

  1. (1) and (2)
  2. (1) and (4) — Correct
  3. (2) and (3)
  4. (3) and (4)

Correct answer

(1) and (4)

Explanation

(1) is true – spreadsheets facilitate 'what-if' analysis and sensitivity testing. (4) is true – the ease of changing assumptions can lead to excessive experimentation and loss of focus. (2) is false – even small errors can significantly distort results. (3) is false – spreadsheets handle quantitative data only.

Question 7

Apex Manufacturing Co is a production company with a modest permanent workforce, but it also relies heavily on temporary staff, whom it recruits on three-month contracts whenever production requirements rise. All buying of materials is the responsibility of the purchasing department, and the company's policy is to maintain low inventory levels of raw materials in order to minimise inventory holding costs. Budgeting is carried out on spreadsheets and detailed variance reports are generated each month for sales, material costs and labour costs. Departmental managers are then paid a monthly bonus depending on the performance of their department. Apex Manufacturing Co operates in a rapidly evolving environment and its finance manager believes the original standard costs are unrealistic. He is contemplating revising the budget by analysing existing variances into a planning and operational element to improve performance. One month ago, Apex Manufacturing Co started manufacturing a new product. The standard cost card for one unit was drawn up to include a cost of 84 USD for labour, based on seven hours of labour at 12 USD per hour. Actual output of the product during the first month of production was 460 units and the actual time taken to manufacture the product totalled 1,860 hours at a total cost of 26,040 USD. After being presented with some initial variance calculations, the production manager realised that the standard time per unit of seven hours was the time taken to produce the first unit and that a learning rate of 90% should have been anticipated for the first 1,000 units of production. The production manager has consequently been criticised by other departmental managers who have said, 'He has no idea of all the problems this (i.e. the failure to anticipate the learning effect) has caused.' Apex Manufacturing Co uses cost plus pricing to set the selling prices for its products once an initial cost card has been drawn up. Prices are then reviewed on a quarterly basis.

Which TWO of the following sentences about the manipulation issues involved in revising budgets are true? (1) The establishment of ex-post budgets is very difficult. Managers whose performance is reported to be poor using such a budget are unlikely to accept them as performance measures because of the subjectivity in setting such budgets. (2) Frequent demands for budget revisions may result in bias. (3) The operational variances do give a fair reflection of the actual results achieved in the actual conditions that existed. (4) The analysis does not help in the standard-setting learning process.

  1. (1) and (2) — Correct
  2. (1) and (3)
  3. (2) and (3)
  4. (3) and (4)

Correct answer

(1) and (2)

Explanation

(1) is true – ex-post budgeting is subjective and likely to be resisted. (2) is true – frequent revisions can introduce bias. (3) is false – operational variances reflect controllable elements. (4) is false – planning/operational split improves future standard setting.

Question 8

Apex Manufacturing Co is a production company with a modest permanent workforce, but it also relies heavily on temporary staff, whom it recruits on three-month contracts whenever production requirements rise. All buying of materials is the responsibility of the purchasing department, and the company's policy is to maintain low inventory levels of raw materials in order to minimise inventory holding costs. Budgeting is carried out on spreadsheets and detailed variance reports are generated each month for sales, material costs and labour costs. Departmental managers are then paid a monthly bonus depending on the performance of their department. Apex Manufacturing Co operates in a rapidly evolving environment and its finance manager believes the original standard costs are unrealistic. He is contemplating revising the budget by analysing existing variances into a planning and operational element to improve performance. One month ago, Apex Manufacturing Co started manufacturing a new product. The standard cost card for one unit was drawn up to include a cost of 84 USD for labour, based on seven hours of labour at 12 USD per hour. Actual output of the product during the first month of production was 460 units and the actual time taken to manufacture the product totalled 1,860 hours at a total cost of 26,040 USD. After being presented with some initial variance calculations, the production manager realised that the standard time per unit of seven hours was the time taken to produce the first unit and that a learning rate of 90% should have been anticipated for the first 1,000 units of production. The production manager has consequently been criticised by other departmental managers who have said, 'He has no idea of all the problems this (i.e. the failure to anticipate the learning effect) has caused.' Apex Manufacturing Co uses cost plus pricing to set the selling prices for its products once an initial cost card has been drawn up. Prices are then reviewed on a quarterly basis.

What is the labour efficiency planning variance AFTER taking account of the learning effect? Note: The learning index for a 90% learning curve is -0.1520.

  1. 1,360 F
  2. 1,360 A
  3. 7,104 A
  4. 23,424 F — Correct

Correct answer

23,424 F

Explanation

Standard hours = 7. Revised cumulative average time per unit for 460 units = 7 × 460^{-0.1520} ≈ 2.756 hours. Revised total hours = 460 × 2.756 ≈ 1,268 hours. Planning variance = (7 - 2.756) × 460 × 12 = 4.244 × 460 × 12 = 23,424 F.

Question 9

Apex Manufacturing Co is a production company with a modest permanent workforce, but it also relies heavily on temporary staff, whom it recruits on three-month contracts whenever production requirements rise. All buying of materials is the responsibility of the purchasing department, and the company's policy is to maintain low inventory levels of raw materials in order to minimise inventory holding costs. Budgeting is carried out on spreadsheets and detailed variance reports are generated each month for sales, material costs and labour costs. Departmental managers are then paid a monthly bonus depending on the performance of their department. Apex Manufacturing Co operates in a rapidly evolving environment and its finance manager believes the original standard costs are unrealistic. He is contemplating revising the budget by analysing existing variances into a planning and operational element to improve performance. One month ago, Apex Manufacturing Co started manufacturing a new product. The standard cost card for one unit was drawn up to include a cost of 84 USD for labour, based on seven hours of labour at 12 USD per hour. Actual output of the product during the first month of production was 460 units and the actual time taken to manufacture the product totalled 1,860 hours at a total cost of 26,040 USD. After being presented with some initial variance calculations, the production manager realised that the standard time per unit of seven hours was the time taken to produce the first unit and that a learning rate of 90% should have been anticipated for the first 1,000 units of production. The production manager has consequently been criticised by other departmental managers who have said, 'He has no idea of all the problems this (i.e. the failure to anticipate the learning effect) has caused.' Apex Manufacturing Co uses cost plus pricing to set the selling prices for its products once an initial cost card has been drawn up. Prices are then reviewed on a quarterly basis.

What is the labour efficiency operational variance AFTER taking account of the learning effect?

  1. 1,360 F
  2. 1,360 A
  3. 7,104 A — Correct
  4. 23,424 F

Correct answer

7,104 A

Explanation

Operational variance = (revised hours 1,268 - actual hours 1,860) × 12 = 592 × 12 = 7,104 A.

Question 10

Apex Manufacturing Co is a production company with a modest permanent workforce, but it also relies heavily on temporary staff, whom it recruits on three-month contracts whenever production requirements rise. All buying of materials is the responsibility of the purchasing department, and the company's policy is to maintain low inventory levels of raw materials in order to minimise inventory holding costs. Budgeting is carried out on spreadsheets and detailed variance reports are generated each month for sales, material costs and labour costs. Departmental managers are then paid a monthly bonus depending on the performance of their department. Apex Manufacturing Co operates in a rapidly evolving environment and its finance manager believes the original standard costs are unrealistic. He is contemplating revising the budget by analysing existing variances into a planning and operational element to improve performance. One month ago, Apex Manufacturing Co started manufacturing a new product. The standard cost card for one unit was drawn up to include a cost of 84 USD for labour, based on seven hours of labour at 12 USD per hour. Actual output of the product during the first month of production was 460 units and the actual time taken to manufacture the product totalled 1,860 hours at a total cost of 26,040 USD. After being presented with some initial variance calculations, the production manager realised that the standard time per unit of seven hours was the time taken to produce the first unit and that a learning rate of 90% should have been anticipated for the first 1,000 units of production. The production manager has consequently been criticised by other departmental managers who have said, 'He has no idea of all the problems this (i.e. the failure to anticipate the learning effect) has caused.' Apex Manufacturing Co uses cost plus pricing to set the selling prices for its products once an initial cost card has been drawn up. Prices are then reviewed on a quarterly basis.

Which ONE of the following statements about the production manager's failure to anticipate the learning effect is true?

  1. There will be no unnecessary extra labour costs
  2. The selling price of the company's products would have been set too low
  3. An adverse material price variance would have arisen — Correct
  4. The sales manager's bonus would have still been guaranteed, in spite of the production manager's failure to anticipate the learning effect

Correct answer

An adverse material price variance would have arisen

Explanation

Failure to anticipate learning leads to idle time (actual hours > expected), wasting resources and incurring extra costs. Higher than expected labour costs may cause adverse material variances if more materials are used/wasted. Selling price may be too low (cost-plus based on overstated costs). Sales manager bonus depends on volume variances, not directly affected.

Ready for the full quiz?

Create a free QuizAnalyst account to practice the complete question set and save your progress.

Sign up free for the full quiz