Question 1

Nova Manufacturing Ltd. operates a job costing system. A new project, Job Sigma-7, requires a prime cost composition of 60 for direct materials, 40 for direct labour, and 20 for direct expenses. Given the hourly pay for labour is 8, and the production overheads are absorbed at 16 per direct labour hour, with non-production overheads charged at 60% of the calculated prime cost. Determine the total cost recorded for Job Sigma-7.

Cost ElementAmountRate/Basis
Direct Materials60-
Direct Labour408 per hour
Direct Expenses20-
Production Overheads?16 per DL hour
Non-Production Overheads?60% of Prime Cost
  1. 240
  2. 260
  3. 272 — Correct
  4. 320

Correct answer

272

Explanation

Prime Cost = 60 + 40 + 20 = 120. Direct Labour Hours = 40 ÷ 8 = 5 hours. Production Overheads Absorbed = 5 hours × 16 = 80. Non-Production Overheads = 120 × 0.60 = 72. Total Cost = 120 + 80 + 72 = 272.

Question 2

Analyze the following descriptions related to costing methods. Identify the statement that is factually incorrect regarding the application of these costing systems.

  1. Job costs are calculated separately for each unique order or project.
  2. Batch costing is essentially a variation of job costing where a group of identical units is managed as a single job.
  3. Process costing is appropriate for manufacturing large quantities of homogeneous units through continuous, sequential steps.
  4. Job costing is typically employed when output units are identical and pass through the same sequence of operations. — Correct

Correct answer

Job costing is typically employed when output units are identical and pass through the same sequence of operations.

Explanation

Statement D is incorrect. Job costing is used for unique or distinct units. The description of identical units passing through the same sequence of operations applies to process costing, not job costing.

Question 3

Nexus Solutions employs a job costing system and uses the total direct labour cost as the basis for applying production overheads. Based on the information for the three projects managed during the period, calculate the overhead absorption rate OAR for the period.

JobOpening WIPMaterial in PeriodLabour for Period
Job 18,50017,15012,500
Job 2029,02523,000
Job 346,00004,500
Total Overheads Actual = Budgeted140,000--
  1. 250%
  2. 300%
  3. 325%
  4. 350% — Correct

Correct answer

350%

Explanation

The overhead absorption rate is calculated as Total Overheads ÷ Total Direct Labour Cost. Total Direct Labour Cost = 12,500 + 23,000 + 4,500 = 40,000. OAR = 140,000 ÷ 40,000 = 3.50 or 350%.

Question 4

Based on the data from the preceding scenario, calculate the final total cost of Job 2, assuming the job was initiated and completed within the current period. Use the derived OAR of 350% of direct labour cost.

  1. 132,025
  2. 132,525 — Correct
  3. 155,500
  4. 159,000

Correct answer

132,525

Explanation

Job 2 Prime Cost = Material 29,025 + Labour 23,000 = 52,025. Overheads Absorbed = 23,000 × 350% = 80,500. Total Cost = 52,025 + 80,500 = 132,525.

Question 5

Astro Labs operates a single process that results in two joint products, Solaris S and Lunar L. The aggregated joint production costs for the period totaled 110,000, which are assigned using the production units achieved. Determine the portion of joint costs allocated to Solaris S.

ProductSales unitsOpening FG Inventory unitsClosing FG Inventory units
Solaris S6,000100300
Lunar L4,000400200
  1. 63,800
  2. 64,000
  3. 66,000
  4. 68,200 — Correct

Correct answer

68,200

Explanation

Production S = 6,000 + 300 - 100 = 6,200 units. Production L = 4,000 + 200 - 400 = 3,800 units. Total = 10,000 units. Allocation to S = 110,000 × 6,200 ÷ 10,000 = 68,200.

Question 6

Cosmic Corp runs a continuous process that yields three main products X, Y, Z and one by-product B. Total joint costs were 277,000. The policy is to reduce joint costs by the revenue generated from the by-product before allocating the net costs to the main products using the sales revenue basis. Calculate the unit cost for Product Z.

ProductSelling Price per UnitUnits of Output
X1810,000
Y2520,000
Z2020,000
B by-product23,500
  1. 4.70
  2. 4.80
  3. 5.00 — Correct
  4. 5.10

Correct answer

5.00

Explanation

By-product Revenue = 3,500 × 2 = 7,000. Net Joint Costs = 277,000 - 7,000 = 270,000. Sales Revenues: X=180,000; Y=500,000; Z=400,000 → Total = 1,080,000. Allocation to Z = 270,000 × 400,000 ÷ 1,080,000 = 100,000. Unit cost = 100,000 ÷ 20,000 = 5.00.

Question 7

Quantum Systems employs a job costing system and calculates the selling price for all orders by adding a 10% markup to the total cost of the job. Job A-9 recorded a prime cost of 2,840 and consumed 45 direct labour hours. The fixed production overheads are absorbed using a rate derived from a total budgeted overhead of 5,000 and total budgeted direct labour hours of 500. Calculate the final selling price quoted for Job A-9.

Cost/Pricing DataAmount
Job Prime Cost2,840
Direct Labour Hours used on Job45
Budgeted Fixed Production Overheads5,000
Budgeted Total Direct Labour Hours500
Selling Price Markup on Total Cost10%
  1. 3,124
  2. 3,290
  3. 3,619 — Correct
  4. 3,656

Correct answer

3,619

Explanation

Overhead Absorption Rate = 5,000 ÷ 500 = 10 per hour. Absorbed OH = 45 × 10 = 450. Total Cost = 2,840 + 450 = 3,290. Selling Price = 3,290 × 1.10 = 3,619.

Question 8

Pioneer Chemicals uses a process costing system in which normal loss is established at 4% of total input in Process 3. Given the input data, determine the abnormal gain or abnormal loss in kilograms kg if the actual output to finished goods was 12,700 kg.

MetricValue
Input from Process 2 kg8,500
Additional Material Added kg4,250
Total Actual Output kg12,700
Normal Loss Rate4% of total input
  1. 460 kg gain — Correct
  2. 460 kg loss
  3. 290 kg gain
  4. 290 kg loss

Correct answer

460 kg gain

Explanation

Total Input = 8,500 + 4,250 = 12,750 kg. Normal Loss = 12,750 × 4% = 510 kg. Expected Output = 12,750 - 510 = 12,240 kg. Abnormal Gain = 12,700 - 12,240 = 460 kg.

Question 9

Alpha Labs' production process typically accounts for a normal loss wastage of 10% of the material input. If the total input for the recent period was 2,500 kg and an abnormal loss of 75 kg was documented, calculate the final quantity of good production units achieved.

MetricValue
Total Material Input kg2,500
Normal Loss Rate10% of input
Abnormal Loss kg75
  1. 2,175 kg — Correct
  2. 2,250 kg
  3. 2,325 kg
  4. 2,425 kg

Correct answer

2,175 kg

Explanation

Normal Loss = 2,500 × 10% = 250 kg. Total Loss = 250 + 75 = 325 kg. Good Output = 2,500 - 325 = 2,175 kg.

Question 10

A manufacturing organization is planning to implement process costing. Examine the following characteristics. Select the combination that accurately describes the typical features of this costing system.

FeatureDescription
1The final product units are identical homogeneous products.
2Production is initiated only after receiving a specific customer order customer-driven.
3Finished goods are valued using an average cost per unit.
  1. 1 and 3 only — Correct
  2. 2 and 3 only
  3. 3 only
  4. 1 only

Correct answer

1 and 3 only

Explanation

Process costing is used for homogeneous products and requires calculation of an average cost per unit. Customer-driven production is typical of job costing.

Ready for the full quiz?

Create a free QuizAnalyst account to practice the complete question set and save your progress.

Sign up free for the full quiz